Generation Interconnection Queues

PJM tracks on pjm.com requests to connect new generating units to the grid and related information. Each request initiates a multi-phased process during which PJM studies the impact and feasibility of the plant on the high-voltage electric transmission system – the grid. A developer can withdraw the request to build at any point in the studies.

PJM has been studying interconnection requests since 2000, and all requests can be viewed in the lettered “queues” on this page of the website. The legend indicates fuel type, status of studies and construction status. You also can filter results by fuel type, status or state.