month's Inside Lines informs PJM's stakeholders of various committee
actions, upcoming training and other activities. PJM would like to highlight
the following:
Members Express Views on PJM's Strategic Planning Initiative
Representatives
of PJM's Membership offered a gamut of views on the Strategic Planning
Process currently underway at PJM. Members discussed their views at a
General Session meeting Nov. 16 in Baltimore, Md.
On Sept. 15, 2006, the PJM Board announced it would solicit members' views
on issues relating to PJM's strategic direction. PJM requested input from
chief executive officers of member companies about PJM's strategic direction.
(more)
Site
Acquired for Second Control Center
PJM
marked an important milestone on November 9 when it acquired an 8.3-acre
site and facilities in Bucks County, Pa. for its second control center.
This purchase was the first actual acquisition of a site for PJM, which
leases its other sites.
Several steps remain before construction begins. Final approval and recording
of the land-use development plan was granted on November 16, allowing
applications for construction permits. Through the balance of the year,
construction contracts will be finalized and issued.
The two buildings on the site will be renovated and prepared for the installation
of PJM systems and hardware. Construction is targeted for completion by
the fourth quarter of 2007. System installation and testing will occur
throughout 2008. The site is expected to be fully staffed and operational
early in 2009.
The site, unoccupied for several years, formerly housed an AT&T communications,
operations and switching center.
(more)
|
www.pjm.com
We are unable to respond
to account inquiries sent in reply to this e-mail. To contact us by phone,
please call our member hotline at 610.666.8980 or toll free 866.400.8980.
|
|
What's
Inside:
Committees
Report
Highlights
Regulatory
Reports
|
| Regulatory
Reports |
Committee Updates |
Upcoming Training |
PJM
FERC Orders
11.22.2006 Docket
No. EL06-94-000 (PDF)
On November 22, 2006, the Commission issued an order in Docket No.
EL06-94-000 denying the complaint filed by the Borough of Chambersburg,
Pennsylvania and the Town of Front Royal, Virginia regarding PJM's
allocation of Auction Revenue Rights ("ARRs") for the time
period from June 1, 2006 through May 31, 2007.
(more)
|
PJM
FERC Filings
11.21.2006
Docket
Nos. ER05-1410-000, 001, EL05-148-000, 001 (PDF)
On November 21, 2006, PJM filed in Docket Nos. ER05-1410 and EL05-148
its answer to the motions of three parties that oppose the RPM settlement
for leave to file replies to the settlement supporters' reply comments.
PJM showed in its answer that the settlement opponents confuse the
issues and do not provide useful or reliable information on which
FERC could base its decision..
(more) |
|
PJM Reminders
Upcoming stakeholder
meetings can be found on PJM's meeting
advisor. The
next MC meeting will be held on January 25, 2006.
Summaries
of all committee meetings will be provided in this newsletter.
New Members
PJM welcomes the following new members:
- Jump
Power, LLC
- S.A.C.
Energy Investments, L.P.
- Joseph
Long & Associates, Inc.
- GLE
Trading LLC
|
|
12.06.2006
– 12.07.2006 PJM
101: The Basics
12.11.2006 – 12.15.2006 System
Dynamics
12.12.2006 Market
Settlements Primer (GEN)
01.09.2006 – 01.10.2006 PJM
101: The Basics
01.16.2007 Generation
101
01.17.2007 Generation
201
01.18.2007 Generation
301
01.19.2007 Operations
101
01.29.2007 – 02.06.2007
Initial Training Program - Generation
01.29.2007 – 02.09.2007 Initial
Training Program - Standard
|
| Committee
Report |
|
Committee Meetings:
November
- Governance
Working Group (GWG)
– 11.30.2006 – Topics: Completion of Draft Committee Handbook
Revisions for Working Group Protocols and Conduct of Meetings, Protocols
for Sector Operations, Continued Progress on Enhancements to Sector
Definitions and Qualification for Membership.
- Demand
Side Response/Metering Issues Subcommittee Jt. Mtg. (DSRWG/MIS)
– 11.30.2006 – Topic: MIS Recommendations for Electronically
Communicating Curtailment Data (ECCD) to PJM – Draft Document
Review.
- Market
Implementation Committee (MIC) – 11.29.2006 –
Topics: Intra-Planning Year ARR Allocation Proposal, Seasonal Allocation
of ARRS, ARR/FTR Credit, MMU Analysis of Combined Regulation Market,
Black Start Revisions (Tariff Schedule 6A), Synchronized Reserve Market
Consolidation, Allocation of Transmission Rights Resulting from RTEP
Transmission Upgrades, Transmission Outage Acceleration Update, Long-Term
Interface Pricing, Review of Updated Manuals and Documentation, EMKT
User Interface, Demand Side Response Working Group Update, Credit Working
Group, Reserve Market Working Group, Long Term FTR Working Group.
- Dispatcher
Training Task Force (DTTF) – 11.28.2006 – Topics:
Report from SOS Liaison, eDART Updates, PJM Operations Training 2006-07,
PJM Drills, Recent Revisions to PJM Operational Manuals: Manuals 03
Transmission Operations, PJM Operator Certification, NERC Training Standard
for System Operating Personnel.
- Long-Term
FTR Working Group (LTFTRWG) – 11.28.2006 –
Topics: Preservation of ARR Capability, Long-Term FTR Credit.
- Credit
Working Group – 11.28.2006 – Topics: Preservation
of ARR Capability, Long-Term FTR Credit.
- Finance
Committee (FC)
– 11.20.2006 – Topics: Third Quarter 2006 Unaudited Financial
Statements, Third Quarter 2006 Financial Review, 2006 Forecast, AC²
- BCP Project Third Quarter 2006 Status, 9-FINCON.
-
Reserve Markets Working Group – 11.17.2006 –
Topics: PJM Market Monitor Report – Measures of Convergence and
Update on Operating Reserves, Generator Credits and Deviations –
Segmented Make Wholes/Parameter Limited Schedules, Ramp Limited Desired
MW, Supplier Netting, Balancing Operating Reserve Allocation.
- General
Session – 11.16.2006 – Topic: PJM’s Strategic
Direction.
- Nuclear
Generation Owners/Operators User Group (NGOUG)
– 11.16.2006 – Topics: Roster Updates, Reactive Testing
Update, EMS Modeling/Plant Notifications, NERC Reliability Standards,
NERC Nuclear Plant Interface Standard, Fall Restoration Drill Update,
SOS/OC Update, Update on INPO Activities or Visits, PJM Stability Analysis.
- Transmission
Substation Subcommittee (TSS)
– 11.16.2006 – 9:00 AM – 3:00 PM
- Markets
and Reliability Committee (MRC) – 11.15.2006 –
Topics: Frequently Mitigated Units, Associated Units Revisions (OA Schedule
1 Section 6.4.2), FERC Investigation on Electric and Gas Market Coordination,
Market Implementation Committee Report, Operating Committee Report,
Future Agenda Items.
-
Members Committee
– 11.15.2006 – Topics: Consent Agenda, Finance Committee,
Governance Working Group, Annual Plan, Executive Report Markets, Executive
Operations Report, Legal Report, Financial Report, State Activities,
ReliabilityFirst Activities, Markets and Reliability Committee Report,
Election of Vice Chair from Generator Owners Sector, Remarks of the
Outgoing Members Committee Chair, Remarks by the CEO, Future Agenda
Items.
- Systems
Information Subcommittee (SIS) – 11.15.2006 –
Topics: Member Company Roundtable, PJM Operations, Inter-RTO Activities,
eSuite Update, PJM Net, Electric Utility Security Issues, Communication
and System Issues, Metrics, Action Items.
- Transmission
Owners Agreement–Administrative Committee (TOA-AC)
– 11.14.2006 – Topics:
NERC and RFC Issues, 500-230kV Transformer Replacement Study, PJM RTEP
Update, TOA-AC 2006 Work Plan Update, Legal Issues Team Update.
- Operating
Committee (OC)
– 11.14.2006 – Topics: Review of Operations, System Operations
Subcommittee, Reliability Pricing Model, Voltage Schedule Working Group,
Markets and Reliability Committee, Market Implementation Committee,
System Information Subcommittee, NERC Update, Reliability First Update,
OC Action Items.
- Governance
Working Group (GWG)
– 11.09.2006 – Topics: Closure of Individual Task Area Items,
Future Agenda Items.
- RPM
Stakeholder Meeting/Avoidable Costs Workshop
– 11.08.2006 – Topics: Revisions to the Original RPM Filed
in FERC Settlement, Time Line for RPM Activities, Conversion of Existing
Contracts, Avoidable Cost.
- System
Operations Subcommittee (SOS)
– 11.08.2006 – Topics: Review of Operations, PJM Realignment,
eDART User Group Update, Dispatcher Training Task Force Update, Data
Management Working Group Update, System Operator Certification, Generation
Owner Survey, Fuel Inventory Reporting, Winter Capability Testing, Reactive
Issues, Executive Summary – Operations Report, PJM Manual Changes,
Future Agenda Items.
- At
Risk Generation Sub-Group (ARG) – 11.07.2006 –
Topic: At Risk Generation White Paper.
- Joint
Tariff
Advisory Committee / Markets
and Reliability Committee – 11.06.2006
Topics: Draft Tariff Schedule for ReliabilityFirst and NERC Billings
and Collection, Joint TAC MRC Discussion – Draft Tariff Revisions
– Participant Funded Transmission Rights.
- Alternate
Dispute Resolution Committee – 11.01.2006 –
Topics: Update on Mediator and Arbitrator List, Proposed Structure of
ADRC, Proposed Schedule 5 Revisions.
- Planning
Committee (PC)
– 11.01.2006 – Topics: Relay Subcommittee Report, Event
Investigation Procedure, Nuclear Interface Standard, NERC Update, Normalized
and Forecasted Peak Reconciliation, Voltage Profile and Reactive Margin
Working Group, Transformer Rating Methodology, NIETC Update, IRM Assumptions
Preview, Planning Committee Parking Lot Issues.
Return
to Top
|
| Highlights |
| Members
Express Views on PJM's Strategic Planning Initiative
Representatives
to the PJM Members Committee offered a gamut of views on the Strategic
Planning Process currently underway at PJM. Members discussed their views
at the Members Committee meeting Nov. 15 at Baltimore, Md.
On Sept. 15, 2006, the PJM Board announced it would solicit members' views
on issues relating to PJM's strategic direction. PJM requested input from
chief executive officers of member companies about PJM's strategic direction.
In addition to concerns of individual members, PJM requested responses
to specific questions in five key areas: network service operations within
the PJM region; regional system planning; market services administration;
demand side response programs and access to markets; and PJM governance.
The Strategic Initiative Report is expected to be completed by March 2007.
Return
to Top
Site
Acquired for Second Control Center
PJM marked an important milestone on November 9 when it acquired an 8.3-acre site and facilities in Bucks County, Pa. for its second control center. This purchase was the first actual acquisition of a site for PJM, which leases its other sites.
Several steps remain before construction begins. Final approval and recording of the land-use development plan was granted on November 16, allowing applications for construction permits. Through the balance of the year, construction contracts will be finalized and issued.
The two buildings on the site will be renovated and prepared for the installation of PJM systems and hardware. Construction is targeted for completion by the fourth quarter of 2007. System installation and testing will occur throughout 2008. The site is expected to be fully staffed and operational early in 2009.
The site, unoccupied for several years, formerly housed an AT&T communications, operations and switching center.
Return
to Top
|
| Regulatory
Reports |
FERC Orders
November
- 11.22.2006
Docket
No. EL06-94-000 (PDF)
On November 22, 2006, the Commission issued an order in Docket No. EL06-94-000
denying the complaint filed by the Borough of Chambersburg, Pennsylvania
and the Town of Front Royal, Virginia regarding PJM's allocation of
Auction Revenue Rights ("ARRs") for the time period from June
1, 2006 through May 31, 2007. The Commission found that PJM correctly
applied its tariff, and that it would not be appropriate to re-run the
ARR allocation process for the 2006/2007 planning period because parties
already have made commitments based on that allocation.
- 11.28.2006
Docket
No. ER06-1474-000 (PDF)
On November 21, 2006, in Docket No. ER06-1474-000, the Commission issued
an order accepting for filing, subject to compliance filings, PJM Tariff
and Operating Agreement amendments that modify the economic planning
component of PJM's RTEP. The effective date of the amendments is September
9, 2006.
- 11.21.2006
Docket No. EL06-103-000 (PDF)
The Commission issued an order on 11/21/2006 denying Indeck-Elwood's
August 31, 2006 complaint (Docket No. EL06-103-000) in which it alleged
that PJM's policy of requiring interconnection customers to post cash
or cash-equivalent security: (i) violates PJM's tariff and (ii) requires
that article 36.8.4(b) of the tariff be revised.
- 11.17.2006
Docket
No. RT01-98-009 (PDF)
On November 17, 2006 the Commission issued an order in Docket No. RT01-98-009
granting rehearing for further consideration of the Commission's order
issued on September 18, 2006, concerning the appropriate rate for transmission
from the Richard H. Gorsuch Generating Station for a locked-in period
of time.
- 11.16.2006
Docket
No. RM06-12-000 (PDF)
The Energy Policy Act of 2005 gave FERC backstop siting authority for
transmission lines if states "withhold approval" on transmission
proposals for more than one-year. The Commission established a rulemaking
docket to determine how to implement this authority and on November
16, 2006, the FERC issued the Final Rule establishing the procedures
that govern its transmission backstop siting authority. Two issues of
interest to PJM addressed in the Final Rule involve the timing of the
federal backstop process, and the definition of the term "withhold
approval", the occurrence of which is the jurisdictional trigger
for the federal backstop siting process.
- 11.15.2006
Docket
No. ER07-47-000 (PDF)
On 11/15/2006, the Commission issued an order accepting for filing the
executed, non-conforming Interconnection Service Agreement (ISA) among
PJM, Liberty Gap Winds Force, LLC (Liberty Gap) and Monongahela Power
Company d/b/a Allegheny Power (Allegheny). The ISA provides for the
interconnection of Liberty Gap's 155 MW wind generating facility to
the PJM transmission system.
- 11.13.2006
Docket No. ER06-1497-000 (PDF)
On September 19, 2006 PJM filed revisions to its Tariff and Operating
Agreement that place a two year time limit on when parties can seek
billing adjustments and on when PJM can make billing adjustments. The
Federal Energy Regulatory Commission issued a Letter Order in Docket
No. ER06-1497 accepting the revisions for filing and establishing an
effective date of November 18, 2006.
- 11.09.2006
Docket
Nos. ER06-1177-000, 001 (PDF)
On 11/9/2006, the Commission issued an order accepting PJM's June 29
filing in the Option to Build proceedings, as amended on 9/12/2006,
subject to conditions, to become effective 8/29/2006, as requested.
PJM is to make a compliance filing within 30 days of the date of this
order.
- 11.06.2006
Docket
Nos. EL06-55-001, EL06-55-002 (PDF)
On 11/06/06, in Docket Nos. EL06-55-001 and EL05-55-002, the Federal
Energy Regulatory Commission issued an order (November 6th Order) that
accepted PJM's marginal loss proposal filed on 8/03/06, to be effective
6/01/07. The November 6 Order accepted the Tariff and Operating Agreement
revisions that implement marginal losses.
- 11.06.2006
Docket Nos. ER06-1083-000, 001, 002 (PDF)
On November 1, 2006, the Commission issued an order in Docket Nos. ER06-1083-000,
-001, and -002, accepting for filing an interconnection service agreement
among PJM Interconnection, L.L.C., Premcor Refining Group, Inc., and
Delmarva Power and Light Company, and a notice of cancellation of an
interconnection service agreement that was superseded, effective May
3, 2006, as requested.
- 11.06.2006
Docket Nos. ER06-1336-000, 001 (PDF)
On November 6, 2006, in Docket No. ER06-1336, the Commission accepted
for filing an unexecuted ISA between PJM, Indeck-Elwood, L.L.C. and
Commonwealth Edison Company, subject to the outcomes of Docket Nos.
EL06-103-000 and ER06-1177-000. The Commission found the ISA to be in
accordance with the expressed terms of the PJM Tariff and necessary
as a result of Elwood's request to become a Capacity Resource.
- 11.03.2006
Docket No. ER06-133-000 (PDF)
On 11/3/06, the Commission issued an order approving a Settlement Agreement
("Settlement") between the City of Geneva, Illinois (Geneva)
and the Commonwealth Edison Company (ComEd). The Settlement resolves
issues raised by Geneva in response to PJM's 11/1/05 filing of an unexecuted
Network Integration Transmission Service Agreement (NITSA) between PJM
and Geneva, and a revised Interconnection Service Agreement (ISA) among
PJM, Geneva and the ComEd (collectively "Agreements"). The
Agreements were filed to replace a grandfathered rate, under which Geneva
had previously taken bundled transmission and distribution service from
ComEd. The relevant charges were provided by ComEd and PJM took no position
with respect to those charges. On 11/22/05, Geneva filed a protest that
disputed the distribution charges. The Commission accepted and suspended
the NITSA and revised ISA on 12/30/05, and established hearing and settlement
judge procedures. On 6/22/06, Geneva and ComEd filed the Settlement,
which resolved all outstanding issues relating to the charges assessed
under the NITSA and ISA, and, the Commission accepted the Settlement
as fair and reasonable and in the public interest.
- 11.01.2006
Docket
Nos. ER06-1083-000, 001, 002 (PDF)
On November 1, 2006, the Commission issued an order in Docket Nos. ER06-1083-000,
-001, and -002, accepting for filing an interconnection service agreement
among PJM Interconnection, L.L.C., Premcor Refining Group, Inc., and
Delmarva Power and Light Company, and a notice of cancellation of an
interconnection service agreement that was superseded, effective May
3, 2006, as requested.
October
- 10.24.2006
ER06-1510-000 (PDF)
On October 24, 2006, the Commission issued an order accepting for filing
an executed Interconnection Service Agreement and Construction Service
Agreement among PJM, South Point Biomass, LLC and Ohio Power Company
d/b/a/AEP, effective August 21, 2006, as requested.
Return
to Top
FERC Filings
November
- 11.21.2006
Docket
Nos. ER05-1410-000, 001, EL05-148-000, 001 (PDF)
On November 21, 2006, PJM filed in Docket Nos. ER05-1410 and EL05-148
its answer to the motions of three parties that oppose the RPM settlement
for leave to file replies to the settlement supporters' reply comments.
PJM showed in its answer that the settlement opponents confuse the issues
and do not provide useful or reliable information on which FERC could
base its decision.
- 11.20.2006
Docket
No. EL03-212-039 (PDF)
On November 20, 2006, PJM and the Midwest ISO filed, in Docket Nos.
ER05-6-023, EL04-135-025, EL02-111-043 and EL03-212-039, a motion for
an extension of time to submit the economic transmission upgrades cross
border cost allocation portion of the filing required by the Commission's
November 21, 2005 Order, currently due on December 1, 2006.
- 11.16.2006
Docket No. ER07-xxx-000 (PDF)
PJM, the New York Independent System Operator, Inc. ("NYISO")
and ISO New England Inc. ("ISO-NE") jointly filed, on an informational
basis, the "Procedure to Protect for the Loss of Phase II Imports"
(the "Procedure") with the FERC on November 16, 2006.
- 11.14.2006
Docket
Nos. ER04-375-017, 018, EL06-97-000 (PDF)
On November 14, 2006, Wisconsin Public Service Corporation ("WPS")
filed a letter with the Commission to briefly address the October 26,
2006 Joint Midwest ISO and PJM informational report filed in Docket
No. ER04-375. WPS urges the Commission to grant the August 16, 2006
complaint filed in Docket No. EL06-97-000, which is still pending Commission
action.
- 11.08.2006
ER05-1410-000,
-001, EL05-148-000, -001 (PDF)
On November 14, 2006, Wisconsin Public Service Corporation ("WPS")
filed a letter with the Commission to briefly address the October 26,
2006 Joint Midwest ISO and PJM informational report filed in Docket
No. ER04-375. WPS urges the Commission to grant the August 16, 2006
complaint filed in Docket No. EL06-97-000, which is still pending Commission
action.
- 11.07.2006
Docket
No. ER06-1474-000 (PDF)
On November 7, 2006, PJM Interconnection, L.L.C. filed in Docket No.
ER06-1474-000, a letter regarding an extension of time for FERC action
in that docket.
- 11.01.2006
ER05-1410-000,
-001, EL05-148-000, -001 (PDF)
On November 1, 2006, PJM filed an Errata to the Reply Comments in Support
of Settlement that were filed on October 30, 2006 in Docket Nos. EL05-148
and ER05-1410 with FERC regarding RPM.
October
- 10.30.2006
Docket
No. EL06-97-000 (PDF)
On October 30, 2006, in Docket No. EL06-97-000, WPS filed an Answer
to Motion to Reject and Alternative Motion to Reply of Midwest ISO and
PJM.
- 10.30.2006
Docket
Nos. ER05-1410-000, 001, EL05-148-000, 001 (PDF)
On October 30, 2006, PJM filed in Docket Nos. ER05-1410 and EL05-148
its reply comments in support of the RPM settlement. PJM showed in its
reply comments that FERC has substantial evidence to find that the RPM
settlement as a whole is just and reasonable, and that the opposing
comments have not supported any requested changes to the settlement,
nor demonstrated that the settlement is not just and reasonable.
- 10.27.2006
Docket
Nos. EL06-62-000, ER06-765-000 (PDF)
On October 27, 2006, H-P Energy filed notice of withdrawal of the Complaint
against PJM without prejudice in Docket No. EL06-62-000.
Return
to Top |
Unsubscribe Instructions
This e-mail newsletter was sent to PJM members. If you do not wish to receive
the PJM Inside Lines newsletter in the future, please click here.
Customer Service
We are unable to respond to account inquiries sent in reply to this e-mail. To contact us by phone, please call our member hotline at 610.666.8980 or toll free 866.400.8980.
© 2006 PJM Interconnection. All rights reserved. |