PJM Hot Weather Operations Update: July 3

Hot Weather Alert Remains in Effect Through July 4 and into July 5 for Mid-Atlantic and Dominion Zones

674

PJM continues to take proactive measures to maintain reliable operations as this week’s extreme heat pushes electricity demand to near record levels.

July 2 Preliminary Peak

On July 2, PJM’s peak instantaneous load was approximately 162,700 MW between 5 and 6 p.m., according to preliminary figures, but that figure was suppressed by the use of demand response programs. The peak load is likely to have surpassed the all-time PJM record of 165,600 MW set in 2006. PJM won’t have an official preliminary peak figure until after the 60-day period required to calculate the performance of approximately 6,000 MW in demand response resources that were activated. 

Additional Actions

During the July 2 evening peak, PJM executed a series of procedures to manage demand and maximize supply when some generation tripped offline, including calling on emergency demand response. PJM also issued a warning to prepare some transmission owners and utilities for the possibility of curtailing data centers and other large loads in their regions and moving them to backup generation. Ultimately, that action was not required and service was not impacted.

Depending on how demand materializes at or near the peak July 3 and based on ongoing conditions, PJM could need to activate these same procedures or others. During any extreme weather event, there is always the possibility that challenges will arise on the system. PJM coordinates with its generation and transmission owners as we respond to the needs of the grid in real-time based on actual conditions to preserve reliability for the 67 million people we serve.

Active Emergency Procedures

The Maximum Generation Alert and Load Management Alert is currently in effect for July 3 for the PJM footprint. This alert does not require any action from customers. This alert is targeted at transmission/generation owners, who then determine if any maintenance or testing on equipment can be deferred or canceled. By deferring maintenance, the units stay online and continue to produce energy that is needed to serve electricity demand within the PJM region. This alert is also used to notify neighboring systems that electricity exports from PJM may be curtailed, serving as a procedural step that allows those neighboring regions to plan accordingly.

PJM issues this alert at the same time as a Load Management Alert, which gives advance notification that load management action may be declared, including Pre-Emergency and Emergency Demand Response. Demand Response programs pay customers in advance who sign up to allow reduction of their electricity use in emergencies.

PJM activated its Pre-Emergency Demand Response and Emergency Demand Response customers across PJM the afternoon of July 3 to increase reserves on the system for the evening peak.

A Hot Weather Alert remains in effect for the entire region PJM serves through July 4 and has been extended through July 5 for only the Mid-Atlantic and Dominion transmission zones.  A Hot Weather Alert is an established procedure PJM issues ahead of forecasted hot weather and/or high humidity to prepare transmission and generation personnel and facilities for expected increases in electricity demand, or load.

Forecasted Peaks

As of 1 p.m. on July 3, 2026, PJM expects to serve the following peak loads through July 5:

DateForecasted Peak Load
July 3157,480 MW
July 4152,039 MW
July 5139,217 MW

Additional Actions

PJM has also taken the following actions to prepare for the extreme heat and humidity:

  • PJM issued a Maintenance Outage Recall on June 25 ahead of the week’s forecasted hot weather. The recall requests for all maintenance outages to be returned to service by today to increase the amount of generation available to meet customer demand.
  • PJM requested and received approval of an emergency 202c order by the U.S. Department of Energy to direct transmission owners, if required as a last resort prior to voltage reduction or load shed, to curtail data centers and other large loads that have backup generation. PJM has requested that this order be extended through July 6.
  • PJM has also submitted and received approval of a DOE 202c emergency order for temporary relief from environmental permit restrictions for generating units, effective July 1 through July 3. This order has been extended through July 6.