PJM Issues Hot Weather Alert for Mid-Atlantic and Southern Regions for June 17

1118

PJM has issued a Hot Weather Alert for June 17 for its Mid-Atlantic and Southern regions.

A Hot Weather Alert helps to prepare transmission and generation personnel and facilities for extreme heat and/or humidity that may cause capacity problems on the grid. Temperatures are expected to go above 90 degrees, which drives up the demand for electricity.

As of 7 a.m. June 17, electricity use is expected to peak at around 137,000 MW for the day.

The Mid-Atlantic region is made up of the Atlantic City Electric, Baltimore Gas and Electric, Delmarva Power & Light, Jersey Central Power & Light, Met-Ed, Penelec, PECO Energy, Pepco, PPL Electric Utilities, PSE&G, and Orange & Rockland (Rockland Electric Company) transmission zones.

The PJM Southern region consists of Dominion Virginia Power’s service territory.

PJM is prepared to serve a forecasted summer peak demand for electricity of approximately 149,000 MW but has performed reliability studies at even higher loads – in excess of 157,000 MW. PJM has approximately 185,000 MW of installed generating capacity available to meet customer needs, with sufficient resources available in reserve to cover generation that is unexpectedly unavailable or for other unanticipated changes in demand.

Last year’s peak demand was approximately 149,000 MW.

A dedicated team of operators uses sophisticated technology to balance supply and demand and direct the power grid 24/7 from PJM’s control rooms. They prepare multiple potential scenarios that could be impacted by weather, emergency conditions or equipment failure. They adjust resource output with changes in demand and ensure that no transmission lines or facilities are overloaded. The team also watches for unusual conditions and reacts to them to protect the electricity supply.